Unscheduled:
- May 25th: SIPRI did maintenance. (Moving equipment)
- May 16th: No RFO was found by the supplier. No further investigation will be done by the supplier of the VPN-service.
- May 13th: The splicing is now finished and all circuits is currently up and running.
- May 10th: One of the two links toward LIU on the green network was down due to a faulty xfp in Sunets router in Fredhäll. After the xfp was replaced the link came online again.
- May 8th: All services restored after re-splicing of the fibre.
- May 7th: There was a login failure on EDUID service which was fixed.
- May 4th: Fibre fault between Vindeln and Umeå solved by changing fibre.
- April 24th: Reachability to ping.sunet.se and some other services were reduced due to physical hardware problem.
- April 13th: The faulty router was replaced.
Scheduled:
- May 25th: Supplier performed a planned maintenance in Filipstad, this affected the connectivity towards Bergsskolan.
- May 24th: Supplier did planned work in Litslena to try to improve quality of the fibre-stretch.
- May 17th: Carrier performed repair of fiber between Överby and Litslena on the north red network.
- May 5th: Supplier performed a planned fiber maintenance.
- May 3rd: Supplier performed a planned maintenance in Filipstad.
Scope |
Unscheduled |
Scheduled |
Total |
Hardware |
1 pcs 2d 09:38 |
0 pcs |
1 pcs 2d 09:38 |
Link |
0 pcs |
2 pcs 00:55 |
2 pcs 00:55 |
None |
7 pcs 6d 20:52 |
3 pcs 00:09 |
10 pcs 6d 21:01 |
Routing |
0 pcs |
0 pcs |
0 pcs |
Software |
1 pcs 03:04 |
0 pcs |
1 pcs 03:04 |