Unscheduled:

  • May 25th: SIPRI did maintenance. (Moving equipment)
  • May 16th: No RFO was found by the supplier. No further investigation will be done by the supplier of the VPN-service.
  • May 13th: The splicing is now finished and all circuits is currently up and running.
  • May 10th: One of the two links toward LIU on the green network was down due to a faulty xfp in Sunets router in Fredhäll. After the xfp was replaced the link came online again.
  • May 8th: All services restored after re-splicing of the fibre.
  • May 7th: There was a login failure on EDUID service which was fixed.
  • May 4th: Fibre fault between Vindeln and Umeå solved by changing fibre.
  • April 24th: Reachability to ping.sunet.se and some other services were reduced due to physical hardware problem.
  • April 13th: The faulty router was replaced.

Scheduled:

  • May 25th: Supplier performed a planned maintenance in Filipstad, this affected the connectivity towards Bergsskolan.
  • May 24th: Supplier did planned work in Litslena to try to improve quality of the fibre-stretch.
  • May 17th: Carrier performed repair of fiber between Överby and Litslena on the north red network.
  • May 5th: Supplier performed a planned fiber maintenance.
  • May 3rd: Supplier performed a planned maintenance in Filipstad.

Scope

Unscheduled

Scheduled

Total

Hardware

1 pcs 2d 09:38

0 pcs

1 pcs 2d 09:38

Link

0 pcs

2 pcs 00:55

2 pcs 00:55

None

7 pcs 6d 20:52

3 pcs 00:09

10 pcs 6d 21:01

Routing

0 pcs

0 pcs

0 pcs

Software

1 pcs 03:04

0 pcs

1 pcs 03:04