You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

Unscheduled:

  • June 25th: We noticed a short downtime on the West Red network. The reason for the outage was a Telenor fiber issue near Örebro. A longer outage was later seen when fiber splicing took place.
  • June 25th: The red link to Linköpings Universitet was cut by an excavator, the fiber was repaired.
  • June 22nd: The outage between Kiruna and Luleå was caused by a damaged fiber pair. Our circuit was moved to another fiber pair and the service was restored.
  • June 20th: After the maintenance in SUNETTICKET-1968 the red link to KTH did not come back up. The reason was a broken transponder card which was changed with a new working one.
  • June 18th: There was an outage on the stretch between Luleå and Kiruna between 06:13 - 06:24 UTC.
    The reason for this outage was our provider started to do a measurement and thought the link was protected.
    When they noticed it wasn't protected they aborted the measurement.
  • June 14th: There was an outage caused by an unannounced maintenance.
  • June 12th: E-VPN service between Fränsta and Stockholm was down due to a power outage
  • June 3rd: An unannounced planned maintenance caused outages on the North Red network between Gävle and Hoforshus.
  • May 30th: There was a brief outage on the red link between SUNET and CTH. No RFO could be found.

Scheduled:

  • June 28th: A transmission node was in Västerås was upgraded, the upgrade process was prolonged due to software and hardware incompatibility's when exchanging cards and flash.
  • June 20th: One of the routing-engines in router m1tug.sunet.se was upgraded in order fix snmp anomalies.
  • June 18th: Our provider performed a planned fiber maintenance on the green network in Göteborg.
  • June 14th: There was a planned fiber maintenance in Göteborg that affected CTH and GU.
  • June 6th: There was a planned router software upgrade.
  • June 5th: Maintenance was performed to restore management to a transmission node in the South Green network.
  • June 4th: There was planned software upgrade of the transmission nodes in the South Green network.
  • June 3rd: Our supplier has performed fiber work on the stretch between Luleå and Kiruna.

Scope

Unscheduled

Scheduled

Total

Hardware

1 pcs 02:20

2 pcs 06:23

3 pcs 08:43

Link

4 pcs 19:07

2 pcs 00:07

6 pcs 19:14

None

4 pcs 2d 00:32

1 pcs 04:19

5 pcs 2d 04:51

Routing

0 pcs

0 pcs

0 pcs

Software

0 pcs

3 pcs 01:02

3 pcs 01:02

  • No labels