Unscheduled:

  • August 23rd: An unannounced planned maintenance was carriued out on the fiber stretch between Norrköping and Kimstad.
  • August 12th: The link between Narvik (KIR5) and Abisko (KIR1) was down due to an unannounced planned work on the fiber.
  • August 6th: There was an outage on the fiber between Kåbdalis (JKK2) and Arvidsjaur (AJR2) due to a fiber break.
  • August 4th: Outage on the link between Karlstad (kar1-r1) and Örebro (lba-r1).
  • July 31st: Temperature was critical at the site in Skövde. Two extra cooling units was installed and temperature is now stable again.
  • July 29th: The link between ORU1 and LB1 was down. The reason was faulty hardware in LBA-R1. After we replaced MIC and CFP the link is stable again.

Scheduled:

  • August 31st: Optical amplification components in Stenkullen and Borås was replaced
  • August 26th: Supplier performed maintenance on the ethernet capacity to Filipstad
  • August 22nd: Provider performed a fiber maintenance.
  • August 22nd: Sunet Adobe Connect was upgraded to version 9.8.1.
  • August 19th: Supplier carried out maintenance in their network.
  • August 15th: Fiber provider performed planned fiber maintenance.
  • August 12th: Fiber supplier performed maintenance between Haparanda (HPA1) and Övertorneå (OVT2).
  • August 3rd: A faulty CFP in our router in Gävle was replaced

Scope

Unscheduled

Scheduled

Total

Hardware

1 pcs 02:45

1 pcs 00:28

2 pcs 03:13

Link

4 pcs 1d 10:57

4 pcs 22:48

8 pcs 2d 09:45

None

1 pcs 03:08

2 pcs 01:45

3 pcs 04:53

Routing

0 pcs

0 pcs

0 pcs

Software

0 pcs

1 pcs 00:30

1 pcs 00:30