Unscheduled:

  • August 5th: Link down due to fiber break.
  • August 4th: Link down to JUNET due to a fiber break, customer moved to hj-br1

Scheduled:

  • August 31st: Suppier performed reconnection and repair of opto cable, Rosenlund-Barnarp.
  • August 30th: Supplier performed cable maintenance due to railway construction that affected the south red network
  • August 16th: Carrier performed a planned maintenance
  • August 16th: Carrier performed a planned maintenance.
  • August 12th: Supplier performed repair of fiber cable, Linghem-Tornby (Red network)
  • August 10th: Supplier performed a fiber cable repair on the south red network between Linghem and Tornby.
  • August 4th: Carrier performed maintenance fiber maintenance between LiU and SMHI

Scope

Unscheduled

Scheduled

Total

Hardware

0 pcs

0 pcs

0 pcs

Link

2 pcs 1d 03:23

5 pcs 11:23

7 pcs 1d 14:46

None

0 pcs

2 pcs 00:04

2 pcs 00:04

Routing

0 pcs

0 pcs

0 pcs

Software

0 pcs

0 pcs

0 pcs