Unscheduled:
- August 5th: Link down due to fiber break.
- August 4th: Link down to JUNET due to a fiber break, customer moved to hj-br1
Scheduled:
- August 31st: Suppier performed reconnection and repair of opto cable, Rosenlund-Barnarp.
- August 30th: Supplier performed cable maintenance due to railway construction that affected the south red network
- August 16th: Carrier performed a planned maintenance
- August 16th: Carrier performed a planned maintenance.
- August 12th: Supplier performed repair of fiber cable, Linghem-Tornby (Red network)
- August 10th: Supplier performed a fiber cable repair on the south red network between Linghem and Tornby.
- August 4th: Carrier performed maintenance fiber maintenance between LiU and SMHI
|
Scope |
Unscheduled |
Scheduled |
Total |
Hardware |
0 pcs |
0 pcs |
0 pcs |
Link |
2 pcs 1d 03:23 |
5 pcs 11:23 |
7 pcs 1d 14:46 |
None |
0 pcs |
2 pcs 00:04 |
2 pcs 00:04 |
Routing |
0 pcs |
0 pcs |
0 pcs |
Software |
0 pcs |
0 pcs |
0 pcs |
|