Logistics
- Date: 27.09.2018
- time: 10:00 - 12:00 CEST
- VC: https://nordunet.zoom.us/j/8804330816 (or see below agenda for other connection options)
Agenda
- NORDUnet / SUNET reorg
- GN4-3 Status (LF)
- EUMETSAT - country updates, status, and joint position (all)
- ESS: Brief update (LF)
- EISCAT: Brief update (LF)
- Planning for 25 October F2F (LF, All)
- Round table updates - All
- AoB
Participants
- DeIC: Tangui
- SUNET: Pelle, Leif, Valter, BJ
- UNINETT: Olaf, Olav
- FUNET: Harri, Matti
- NORDUnet: Erik-Jan, Jørgen, Lars
- RHnet: Marius
Notes
- NORDUnet / SUNET reorganisation
- NORDUnet is in the process of transferring Swedish office and staff to SUNET
- NORDUnet and SUNET is in the process of contracting for SUNET to deliver NOC and engineering services to NORDUnet
- Process ongoing
- Expected to settle bu 01.01.2019
- eduVPN - to be discussed at F2F
- There will be a early adopter meeting in Utrecht, 5-6 November. Tangui to send info to the CTO mailing list
- Pelle want to be able to limit exit points to Swedish want
- Offers submitted
- Some people have been contacted, many have not.
- No systematic feedback
- Results expected by next week
- Overbudgeting was eventually not done
- ESS
- Contract preparation for site interconnection ongoing
- overview of how the world of NRENs work
- EISCAT-3D
- Fibre routes have settles
- contract preparation in progress
- They might after all go for 100G
- They might after all go for White Rabbit timing service
- FUNET has been in contact with SGO in Södankyla.
- EUMETSAT
- Lars: process is cumbersome
- SUNET: has a site, process is cumbersome.
- BJ: there's two many levels, both in customer handling and in operations.
- BJ: "We (SUNET) don't know anything,
- BJ: As SUNET has not customer relationship, there's no way to recover cost.
- Valter: Proposal to GÉANT was not accepter. Valter would like to see us help GÉANT
- Per: is traffic only from EUMETSAT to SUNET? Lars: two things are going on 1) traffic from data downlink sites 2) traffic
- UNINETT: challenges with Svalbard fibre cable regulation.
- Lars: EUMETSAT want to buy from one site
- Per: For GÉANT to add value, they should help us explain the NREN model to EUMETSAT.
- LF: we should split the traffic distribution and the data collection
- Valter: GÉANT should focus on their value add; they should not be a single point of contact.
- LF to set up VC with Chris. LF + BJ + Martin + Olaf / Vidar + Matti
- F2F planning
- Joint Cloud as a common topic.
- Leif, Pelle: want discussion
- Harri: probably do not have a common position on cloud in general
- Also do Research Platform & Science Engagement - higher level
- Discussion of what NREN are doing in the area
- Valter: let's share on mailing list what we think of as a research platform
- Leif: Each NREN come with presentation on their thinking
- LF: Jan M can then present on the service delivery aspect
- LF. in summary, first Cloud strategy meeting will be a series of presentations of perspectives , with
- LF to post first iteration of CTO Forum agenda
- Joint Cloud as a common topic.
- UNINETT update
- Broadnet meeting; objective is a Esbjerg - Oslo fibre
- Realtime, music collaboration over network.
- Want to do a networking for music performance and production workshop @ NDN.
- Pelle would like us to measure jitter in the network, so we can talk about if that is OK
- Is there a relation to the LOLA and Network Performing Arts workshops
- Pelle would like there to be measurements on the table before a workshop
- Marius: doing jitter measurements properly is a really hard thing to do
- LF: OK, we will take this into preparation of the workshop and work with UNINETT
- Olaf to lead workshop preparation, NDN will do logistics
- Working on decision document for Trondheim to Vasa; decision on NORDUnet reimbursement of links is not ready yet.
- FUNET
- FUNET2020 ongoing
- Procuring data centre switches
- Panopto activity is very high. 8 universities interested, in addition to Kaltura service
- Qvist: we have some storage issues due to a delay on an misfired procurement; should be resolved by start Q1
- Pelle: can we have a media strategy workshop for media?
- Pelle: do NORDUnet need a bigger media team? Qvist: Depend on how much support NORDUnet will have to do
- LF: a media workshop cannot be 2018, but it will go on the list
- SUNET
- multifactor login has been approved for SWAMID, will be rolled out by Q1
- CNaaS and (educational) SOC are the big things
- U. Michigan had a presentation at GLIF. They are automating heavily. Pelle and Leif will meet with Eric Boyd at TechEx. Looks like they are interested in collaborating with Nordic NRENs.
- DeIC
- No update
- RHnet
- Initiated 8-16 channel DWDM deployment on RHnet fibre
- University of Iceland IT services is being completely re-done; outcome is so far unknown.
- Plan to have RHnet join eduGAIN is put on hold for now.
- AoB:
- none
Video Instruction
Join meeting using Zoom
Meeting ID: 880 433 0816
Join from PC, Mac, Linux, iOS or Android: https://nordunet.zoom.us/j/8804330816
Or iPhone one-tap (US Toll): +14086380968,8804330816# or +16465588656,8804330816#
Or Telephone:
Dial: +1 408 638 0968 (US Toll) or +1 646 558 8656 (US Toll)
+358 800 102 188 (Finland Toll Free)
Meeting ID: 880 433 0816
International numbers available: https://nordunet.zoom.us/zoomconference?m=s4B8oYHq_xJHPPIoB-nK123DPme5Ano6
Or a H.323/SIP room system:
H.323: 109.105.112.236
Meeting ID: 880 433 0816