Unscheduled:

  • November 19th: We had several outages in Umeå due to two faulty cards in our transmission equipment. The cards were replaced and that solved the problem.
  • November 5th: We noticed a few outages on the green link to CSBNET. The reason was a broken M6 transmission card which was replaced.
  • November 1st: Loss of signal on Kiruna - Luleå link was caused by a fiber cut between Kiruna and Poultikasvaara

Scheduled:

  • November 24th: Supplier performed planned maintenance.
  • November 20th: OTDR measurement was performed on the fiber stretch between Boden and Åkroken.
  • November 17th: Interface cards were replaced on a SUNET router in Stockholm.
  • November 10th: Carrier performed planned maintenance.
  • November 10th: Supplier performed fiber maintenance in Göteborg.
  • November 5th: A faulty controller card was replaced in our DWDM equipment in Göteborg

Scope

Unscheduled

Scheduled

Total

Hardware

1 pcs 00:24

1 pcs 00:09

2 pcs 00:33

Link

0 pcs

3 pcs 05:57

3 pcs 05:57

None

2 pcs 6d 07:39

2 pcs 02:34

4 pcs 6d 10:13

Routing

0 pcs

0 pcs

0 pcs

Software

0 pcs

0 pcs

0 pcs

 

 

  • No labels