Scheduled: Scope Unscheduled Scheduled Total Hardware 2 pcs 00:38 2 pcs 00:16 4 pcs 00:54 Link 1 pcs 00:26 5 pcs 12:30 6 pcs 12:56 None 1 pcs 1d 00:35 3 pcs 06:20 4 pcs 1d 06:55 Routing 0 pcs 0 pcs 0 pcs Software 0 pcs 0 pcs 0 pcs
Unscheduled: * January 27th: Switch connected to server hosting service was rebooted. * January 16th: One of the links to LNU in Växjö was down. The link restored after restart of the interface card. * January 11th: FPC 0 on ltu-r1 went offline that caused a short outage for LTU. Reseat of the FPC resolved the issue. * November 17th: All the FPCs on router hh-r2 lost connectivity to the routing engine for a short time. No cause found yet, supplier still investigating the issue. Scheduled: * January 31st: Supplier performed emergency maintenance on the link between Kalix and Haparanda. * January 27th: A switch in TUG was rebooted. * January 26th: A planned maintenance Optimization of Sunet darkfiber link between Örebro and Löa was performed. * January 25th: Supplier perform fiber measurements between Varla and Onsala. * January 18th: Cleaning was done on one of the MDH links * January 18th: Carrier performed planned maintenance affecting the link between Göteborg and Borås. * January 17th: Carrier performed planned maintenance affecting the link between Kiruna(KIR3) and Rensjön (KIR2). * January 17th: An emergency maintenance on Sunet Adobe Connect system was performed. * January 10th: Supplier performed a planned maintenance in their network. * January 9th: The transmission component at Eskilstuna which reported a "voltage out of a range" alarm was replaced.