Child pages
  • 201910 - Public report
Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

Unscheduled:

  • October 24th: The link towards Riksarkivet in Ramsele was reported down and came back up at 07:00 UTC.
  • October 22nd: Two links from klx1-r1 to FUNET were down due to an unannounced planned maintenance.
  • October 22nd: The link between nkg188-r1 and sthb-r1 was down after a planned maintenance.
  • October 21st: There was a fiber break between Kongsvinger and Oslo.
  • October 15th: Link between Karlstad and Luleå was down due to an unannounced maintenance.
  • October 13th: There was an outage between KGV11 and GAUS23 due to an unannounced planned maintenance from fiber supplier.
  • October 12th: The router mah-r2.sunet.se was unreachable. It was intimated by an error in a routing engine. The faulty part has been replaced.
  • October 11th: Link between MIUN4 and Ostersund was down, no RFO found.
  • October 11th: The link to GIH was down due to a faulty router, the router was replaced and service was restored.
  • October 10th: FPC1 restarted on umu-r2.sunet.se. The part is now replaced.
  • October 9th: The link between Sveg and Rätan was down due to an unannounced planned maintenance.
  • October 7th: The link between hb-r2 and ske109-r1 was down due to a broken FPC in hb-r2.
  • October 2nd: The link between HB and Skövde was down.Link is back up after restart of line card
  • October 1st: Major Errors on FPC 5 of router hb-r2.sunet.se. Service was restored after a reset of the card.

Scheduled:

  • October 23rd: Supplier performed cable splicing due to construction of a power station.
  • October 22nd: Supplier performed repair of damaged WRAP-cable. Due to security reasons this maintenance was performed in daylight.
  • October 20th: Supplier performed fibre maintenance in Jönköping.
  • October 13th: Supplier performed mandatory fiber work.
    Between OVT2 – HPA1
  • October 9th: Supplier performed maintenance, wavelength between MIUN and Karlstad was unavailable.
  • October 9th: The core link between FRE and TUG was migrated to a new link.
  • September 30th: Supplier performed maintenance on a power substation at Hedenlunda, Hall, Kolbotten.

Scope

Unscheduled

Scheduled

Total

Hardware

0 pcs

0 pcs

0 pcs

Link

9 pcs 3d 11:27

6 pcs 2d 23:20

15 pcs 6d 10:47

None

5 pcs 12:09

1 pcs 00:09

6 pcs 12:18

Routing

0 pcs

0 pcs

0 pcs

Software

0 pcs

0 pcs

0 pcs

  • No labels