Child pages
  • 201710 - Public report
Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 3 Current »

Unscheduled:

  • October 27th: The link between Växjö and Visby was down due to a fiber cut. The fiber has been temporarily restored and a permanent fix will be implemented during a service window to be announced later.
  • October 26th: SUNET backbone link between Kiruna and Kalix was down due to a fiber cut in the fiber stretch.
  • October 20th: Lost connection to LIU, SFHM and SMHI due to a fiber break. RFO still pending.
  • October 11th: A fiber break caused an outage on the stretch between Nybro and Kalmar.
  • October 8th: The link between Kiruna and Narvik was down due to a faulty optical transceiver.
  • September 7th: Customer LU was experiencing bit faults on their dark fibre between Lund and Helsingborg. This was solved by moving traffic to another fiber stretch.

Scheduled:

  • October 31st: Fiber supplier performed troubleshoot and repaired a fiber in Växjö due to high attenuation.
  • October 30th: Supplier relocated fiber cables in Norrköping area.
  • October 27th: The CFP in ki-r1 was swapped due to errors on the link.
  • October 25th: Fiber patch connected to KI in Fredhäll was inspected and cleaned in order to troubleshoot bit error issue on the link.
  • October 23rd: Sub supplier performed refurbishment maintenance in junction box in their network between the two sites Kimstad (KIM2) and Linköping (LIN3).
  • October 17th: Fiber supplier performed fiber maintenance in Växjö.
  • October 16th: Due to construction of new substation supplier relocated fiber cables in Norrköping area.
  • October 11th: A planned software upgrade maintenance was performed on the Beta adobe connect setup.
  • October 9th: The router sbo-r1 was upgraded with a new junos software.
  • October 2nd: A planned maintenance to move some of the Adva equipment in site FRE, Stockholm was performed.
  • October 1st: Carrier performed a planned fibre maintenance between Arvidsjaur and Jokkmokk.

Scope

Unscheduled

Scheduled

Total

Hardware

0 pcs

1 pcs 00:01

1 pcs 00:01

Link

5 pcs 2d 13:13

4 pcs 09:41

7 pcs 2d 22:54

None

3 pcs 1d 05:23

4 pcs 05:00

7 pcs 1d 10:23

Routing

0 pcs

0 pcs

0 pcs

Software

0 pcs

2 pcs 04:19

2 pcs 04:19

  • No labels