Unscheduled:

  • July 29th: Site SFA24, Installation-ID 100130048 on Assistentgatan 23, Skellefteå was down due to a power outage. The site owner has restored the power and the connection is up again.
  • July 18th: The link between Abisko and Rensjön was down due to a fiber break. The fiber has been repaired and connectivity is fully restored.
  • July 14th: BGP between our router in Filipstad and Stockholm was down due to provider emergency maintenance.
  • July 7th: Difficulties reaching connect.sunet.se due to network problems.

Scheduled:

  • July 31st: SUNET performed software upgrade on one of the core routers in Stockholm.
  • July 31st: The network interfaces on the transit router in Borås were restarted, one a the time, in order to correct a critical software bug.
  • July 30th: Carrier performed fiber maintenance. This affecedt the link between Arvidsjaur and Kåbdalis.
  • July 28th: SUNET performed upgrade on core routers.
  • July 27th: SUNET performed software upgrade on core routers. The routers are sbo-r1, lba-r1, trh-r1, hsd-r1, vxj-r1 and bos-r1
  • July 27th: Fiber supplier performed fiber optimization maintenance between Gällivare (GLV1) and Jokkmokk (JKK1).
  • July 17th: The fiber between the router located at Högskolan i Halmstad and Halmstad POP increased the attenuation value with more than 4 dbm. Fiber provider is performed fault trace the issue during above window but did not find any fault. Investigation will follow at the original trouble ticket.
  • July 12th: An emergency software maintenance was performed on the Sunet Survey service.
  • July 10th: SUNET performed software upgrade on router onsala-r1.sunet.se
  • July 10th: SUNET performed software upgrade on routers klx1-r1, hj-r1, hh-r2, ume8-r1 and uu-r1.
  • July 6th: A planned maintenance to migrate SUNET Adobe connect to a new setup of servers was performed.

Scope

Unscheduled

Scheduled

Total

Hardware

0 pcs

1 pcs 00:23

1 pcs 00:23

Link

1 pcs 00:08

2 pcs 12:45

3 pcs 12:53

None

3 pcs 23:48

3 pcs 08:55

6 pcs 1d 08:43

Routing

0 pcs

0 pcs

0 pcs

Software

0 pcs

5 pcs 03:38

5 pcs 03:38