Child pages
  • 201705 - Public report
Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

Unscheduled:

  • May 28th: There was an unannounced maintenance with MDH routers.
  • May 27th: The link between Halmstad (HSD1) and Holmagärde (HGE) was down due to cable fault. This has now been fixed.
  • May 17th: The connection from the redundant router (hh-r2.sunet.se) to SUNET-C was down. Fiber was repaired by supplier and it is up again.
  • May 16th: eduID service was intermittently unavailable due to network problems with both IPV4 and IPV6. Now it is available again.
  • May 9th: The link between Göteborg and Borås was down due to fiber break. The provider has spliced the fiber.

Scheduled:

  • May 22nd: Supplier performed maintenance on their network.
    This is the fiber stretch between VLA (Varla) and HGE (Holmagärde)
  • May 18th: SUNET performed software upgrade on routers onsala-r1 and mcen1-r1.
  • May 18th: SUNET performed software upgrade on routers: mah-r1, ki-r2, hj-r1, hkr-r1 and uu-r1.
  • May 17th: Router upgrade performed on upa-r1 and fre-r2.
  • May 17th: SUNET performed software upgrade on core routers located in Kalmar (kmr88-r1), Lund (lnd88-r1), Borås (bos-r1), Trollhättan (trh-r1), CTH (cth-r1) and DU (du-r1).
  • May 16th: SUNET performed software upgrade on core routers located in Kalix (klx1-r1), Göteborg (gbg7-r2) and Stockholm (tug-r2).
  • May 16th: SUNET performed software upgrade on core routers located in Stockholm (fre-r1), Gävle (sbo-r1), Umeå (ume8-r1), Västerås (fsn2-r1), Norrköping (nkg188-r1) and Växjo (vxj-r1).
  • May 16th: Fiber supplier performed fiber optimisation between Boden and Luleå (BDN1 - LLA1) .
  • May 15th: SUNET performed software upgrade on core routers located Kiruna (kir3-r1), Skövde (ske109-r1) and Linköping (lin3-r1). The upgrade was done on one router at a time.
  • May 15th: Router upgrades done.
  • May 15th: Fiber supplier performed maintenance on the link between Norrköping and Linköping (NKG188 - LIN3). This aslo affected the link between LIU2 and NKG188.
  • May 10th: Fiber provider has finished the preparation for the optimisation of the link between Göteborg and Borås.
  • May 9th: SUNET performed software upgrade on core router located in Karlskrona (kka8-r1).
  • May 9th: SUNET performed software upgrade on core routers located in Kiruna (Kir5-r1, kir3-r2), Luleå (lla-r2), Falun (fln4-r1) and Karlstad (kar1-r1).
  • May 4th: Fiber provider will performed a maintenance on the dark fiber between Uppsala Universitet and Sveriges lantbruksuniversitet.
  • May 3rd: We have upgrade JunOS version in hh-r2.sunet.se
  • May 1st: Fiber provider performed a planned maintenance on a stretch between Lund and Lyby.

Scope

Unscheduled

Scheduled

Total

Hardware

0 pcs

0 pcs

0 pcs

Link

3 pcs 18:01

4 pcs 22:35

7 pcs 1d 16:36

None

2 pcs 08:15

12 pcs 04:47

14 pcs 13:02

Routing

0 pcs

0 pcs

0 pcs

Software

0 pcs

1 pcs 00:12

1 pcs 00:12

  • No labels