Installation instructions
- Rack the switch (EX4200) and both servers in a 3U space
- Install a total of 5 power lines: 2 per server and 1 for the switch
- Install the following ethernet cables:
From | To | Description |
---|---|---|
ge-0/0/0 | RHnet router port | |
ge-0/0/1 | is-rhnet-vm1.samlbits.net eth0 | |
ge-0/0/2 | vm0.is.rg.net eth0 | |
ge-0/0/12 | is-rhnet-vm1.samlbits.net ipmi | |
ge-0/0/13 | vm0.is.rg.net ipmi |