Child pages
  • 201305 - Public report
Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 4 Current »

Unscheduled:

  • May 27th: We experienced a short flap on our west red network. No RFO was found.
  • May 24th: A synchronization failure on a transmission card in Karlstad caused an outage on the green link to KAU. A restart of the transmission card restored the traffic.
  • May 22nd: We had a faulty card in our DWDM equipment in Karlstad caused outage on the green network. The card was replaced.

Scheduled:

  • May 7th: Broken transponder cards were replaced on SUNET transmission equipment in Halmstad.
  • May 3rd: Fiber maintenance was performed by carrier on the stretch Borås-Ulricehamn.
  • May 2nd: A planned maintenance in the north green network on the stretches Fredhäll-Uppsala and Fredhäll-Sundsvall was performed.

Scope

Unscheduled

Scheduled

Total

Hardware

1 pcs 08:11

1 pcs 01:14

2 pcs 09:25

Link

2 pcs 00:27

1 pcs 00:06

3 pcs 00:33

None

0 pcs

1 pcs 00:01

1 pcs 00:01

Routing

0 pcs

0 pcs

0 pcs

Software

0 pcs

0 pcs

0 pcs

  • No labels