Child pages
  • 201106 - Public report
Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 6 Next »

Unscheduled:

  • 22.06.2011 05:14 UTC - The were outages in the SUNET core caused faulty transmission card. After replacement of the F-10 card in the node NG_421_Kl_Cy, the interface has been stable.
  • 10.06.2011 04:08 UTC - There were two brief outages on the SUNET south red network. No RFO could be established.
  • 14.06.2011 09:18 UTC - A node in the SUNET core rebooted due to power failure caused by an unannounced maintenance on site.

Scheduled:

  • 15.06.2011 15:58 UTC - A maintenance was performed to restore management of SG_421_Mun_Ov. However, due to a corrupt flashcard there were complications and the maintenance took longer than expected and the node is currently running with an older software version. The resulting outage affected Högskolan i Halmstad.
  • 22.06.2011 15:32 UTC - Fiberwork was carried out in Ronneby by TDCs subcarrier affecting Högskolan i Kristianstad, Lunds Universitet, Malmö Högskola, Linnéuniversitetet and the SUNET core.
  • 22.06.2011 15:32 UTC - Fiberwork was carried out in Ronneby by TDCs subcarrier affecting Linnéuniversitetet, Blekinge Tekniska Högskola and the SUNET core.
  • 27.06.2011 11:58 UTC - Planned maintenance was performed to upgrade GSIX's green connection causing a brief outage.

Scope

Unscheduled

Scheduled

Total

Hardware

2 pcs 2d 00:42

0 pcs

2 pcs 2d 00:42

Link

0 pcs

3 pcs 10:17

3 pcs 10:17

None

1 pcs 00:02

2 pcs 05:31

3 pcs 05:33

Routing

0 pcs

0 pcs

0 pcs

Software

0 pcs

1 pcs 01:07

1 pcs 01:07

  • No labels