Unscheduled:

  • 22.06.2011 05:14 UTC - The outages were due to faulty transmission card. After replacement of F-10 card in the node NG_421_Kl_Cy, the interface has been stable.
  • 07.04.2011 08:53 UTC - A faulty power module had to be replaced in Kiruna. At the time of the maintenance there was a brief outage between Luleå and Kiruna.
  • 10.06.2011 04:08 UTC - There were two brief outages on the SUNET south red network. No RFO could be established but the link has now been stable for a week.

Scheduled:

  • 15.06.2011 15:58 UTC - A maintenance was performed to restore management of SG_421_Mun_Ov. However, due to a corrupt flashcard there were complications and the maintenance took longer than expected and the node is currently running with an older software version.
  • 22.06.2011 15:32 UTC - Fiberwork was carried out in Ronneby by TDCs subcarrier.
  • 22.06.2011 15:32 UTC - Fiberwork was carried out in Ronneby by TDCs subcarrier.
  • 23.03.2011 16:11 UTC - Due to a software bug in a few nodes in our transmission network we needed to perform software downgrades.
  • 27.06.2011 11:58 UTC - Planned maintenance was performed to upgrade GSIX's green connection. The maintenance is complete and connectivity restored.
  • 14.06.2011 09:18 UTC - Niklas from IPnett reports that the engineers had accidentally triggered the power outage. It has been restored and there are currently no alarms.

Scope

Unscheduled

Scheduled

Total

Hardware

2 pcs 2d 00:42

0 pcs

2 pcs 2d 00:42

Link

0 pcs

3 pcs 10:17

3 pcs 10:17

None

1 pcs 00:02

2 pcs 05:31

3 pcs 05:33

Routing

0 pcs

0 pcs

0 pcs

Software

0 pcs

1 pcs 01:07

1 pcs 01:07