Child pages
  • 202004 - Public report
Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 6 Next »


Unscheduled:

  • April 29th: The link from Lund to ESS was down. Fibre provider could not find an RFO.
  • April 19th: The core link between Gävle - Uppsala went down due to a faulty card in router sbo-r1.sunet.se. The card has been replaced and the link is back up.
  • April 19th: FPC crashed, causing one link to SP to go down. Solved toggling fpc2 and mic1 offline/online.
  • April 16th: The router slu-ume-r1.sunet.se rebooted. RFO unknown.
  • April 12th: There was degraded signal on the stretch between Varla and Holmagärde which has been resolved by switching to a new fiber pair.
  • April 9th: We had a short outage in the fiber stretch located between BOS (Borås) and SKU1 (Stenkullen). This was due to a subcontractor that had problems with cabling.
  • April 7th: Outage after planned maintenance. RX and TX had been shifted.
  • April 5th: Broken CFP caused issues with the link between DU2 and DU3. Solved the issue by replacing the CFP.
  • April 3rd: Login to eduID was not working. The issue is fixed.
  • April 1st: We experienced a link down between kir3-r1 and klx1-r1 due to power outage.

Scheduled:

  • April 27th: A router in site Stockholm-B was upgraded to a new software release.
  • April 26th: Supplie performed maintenance between Älvsbyn (ABN1) - Åkroken (AJR22) and Älvsbyn (ABN1) -and Boden (BDN)
  • April 26th: Supplie performed maintenance between Älvsbyn (ABN1) and Boden (BDN).
  • April 23rd: Supplier performed network maintenance in Göteborg. Maintenance completed.
  • April 16th: Fiber provider performed fiber maintenance between Jönköping and Rusken.
  • April 14th: Fiber supplier performed rerouting of circuits at Svenäcker-Mellerud .
  • April 8th: Supplier performed Network maintenance.
  • April 6th: Supplier performed network maintenance in Göteborg
  • April 5th: Provider performed fiber maintenance in Göteborg.
  • April 3rd: eIDAS connector service in QA environment was reinstalled.
  • April 2nd: Supplier performed maintenance to improve optical values on fiber between Mörarp and Lund.

Scope

Unscheduled

Scheduled

Total

Hardware

0 pcs

0 pcs

0 pcs

Link

4 pcs 3d 00:45

9 pcs 1d 23:18

13 pcs 5d 00:03

None

5 pcs 20:31

0 pcs

4 pcs 20:31

Routing

0 pcs

0 pcs

0 pcs

Software

1 pcs 00:24

2 pcs 01:15

3 pcs 01:39

  • No labels