CTO Forum Face-2-Face meeting

Logistics

    • Participation: please complete doodle 
    • date: 26.05.2016
    • time: 10:00 - 15:00 CEST
    • venue: NORDUnet office Kastrup
    • VC" room for remote participation: 63246252

...

  1. Updates (45 mins)
    1. GÉANT (VN)
    2. GN4 Update
    3. EOSC & ECI - short term & long term initiatives
  2. Nordic Media Group (11:00-12:00).  
    1. Status and Current work (Thorkild Jensen) 
    2. Discussion
  3. Low-delay video / Nettmusik (OK)
  4. Lunch (45 minutes)
  5. Country / NORDUnet updates (max. 20 minutes per NREN)
    • FUNET slides
    • SUNET slides
    • UNINETT slides
    • DeIC slides
    • RHnet slides
    • NORDUnet slides
  6. Conferences & Workshops 
  7. AOB

Participants

  • Leif, Per, Valter (SUNET)
  • Olav, Vindar, Anders (UNNETT)
  • Martin, Tangui, Ole, Thorkild (DeIC)
  • Jon-Ingi (RHnet)
  • none from FUNET
  • Lars, Jørgen, Josva (NORDUnet)

...

Notes

  • We discussed network and innovation strategy.  We need a larger community discussion. First step would be a strategy brainstorming workshop, to synthesize views and issue, possible as a two-day event back-to-back with a CTO F2F in the fall, possibly facilitated.
  • EOSC: we like
  • There is a need for a network strategy discussion, and a network innovation discussion. Or both.  LF / JK to bring this to the board. Maybe start with a tech strategy brainstorm workshop.  
  • Step 1: organize workshop to synthesize.  Facilitator?  Two-day CTO event in the fall. Needs preparation.  In the fall.  
  • JK / LF to make proposal for workshop, for group and board.
  • EOSC: the basic idea of data analytics is good, but worry it is lost in big politics.  The larger ECI/EOSC proposal appear to have move far from the NREN field. 
  • We  We believe that data analytics is going to be important . We will search for ways and would like to create initiatives in that area, in Nordic or EuropeEuropean. We may inject something in WP18-20. To put on a future CTO meeting. Maybe push for a data analytics TF in GÉANTPossibly a GÉANT TF or workshop on data analytics
  • Thorkild presented the NMG and the overview of media systems they have produced; the overview gives a nice summary and useful input for vendor discussions and tender processes.  
    • Discussion point: is the evolution towards comprehensive VC systems with voting, break-out, meeting management, etc., or is it towards embeddable video leaving other functions to, say, LMS systems.
    • More work is needed to ensure that matrix represents a consensus view.  The The process was open, but we're only at first step of getting consensus. More work is needed
    • Next step would be to get precise, is technical requirements for a procurement process, and their ranking. This will come from the to be done in European procurement process. 
    • Next step for media group is to help with assist evaluation in the European procurement. Thorkild is willing to push for more work in the media group.
    • Upcoming The opcoming tender does not mean that AdobeConnect go awaygo away; there's not direct connection between the two.
  • Otto Winther presenting Musikknett - low latency video (conferencing) for music education.
    • UNINETT has built a lab and is testing methods to get rid of delay.  Often delay comes not from the network
    • Over the summer, at student will test how low you can go with WebRTC.
  • Updates
    • NORDUnet: 
      • Tundra project going ahead.  Press release now-ish. 
      • LMS tender going ahead.  Tender should be out before summer holidays. Unclear if DANTE procurement team will run it; otherwise, NORDUnet will
    • SUNET:
      • Preparing to trial (connectivity to) MS Express Route; A few universities want it. DeIC is recommending universitites to await the results of the GÉANT IaaS tender. That will happen October. 
      • Anders Nilsson is trying to will put a team together to on eduroam probes. SUNET and UNINETT working together on further developing and testing eduroam probes. Other Nordic NRENs are welcome to join.   This could be generalized into a  A Nordic WiFi Group .  eduroam probes could be their starting point. LF/VF to talk to Anders and Tom. Olaf ask that NDN help with framework for the group. is an option.    
      • New network progressing. 8 links up.  Fibre challenges encountered. 
      • Interest in eduID statistics and status.  LJ will find references and send to list.
      • ESS: SUNET is talking to local ESS IT in Lund about connectivity; SWAMID it talking to them about membership. SUNET is considering fibre access to the instrument sites. 
    • UNINETT
      • Router procurement concluded.  Juniper is winningselected.  UNINETT is interested in testing Ansible for automation and orchesration. UNINETT will be testing Ansible. 
      • New, norwegian Norwegian cable project - Virginia - Blåbjerg.  Kurosh much involved. To be completed in 2019.  May be of interest to NORDUnet, for 2019. Kurosh can set up meetingmake introductions.
      • Aquacom project to build cable Ireland - Trondheim.   Fits well into a strategy where NORDUnet is also looking at new Helsinki - Frankfurt cablePossible element if future NDN footprint.
      • FEIDE has implemented two-factor authentication.  Continued FEIDE evolution and authentication in general.  
      • UNINETT has built a prototype data analytics, as a containerbased service.  Currently running in google cloud. container based service  UNINETT is piloting with researchers, and now demonstrating a web-based frontend.   UNINETT Sigma is considering a larger-scale pilot.
    • EISCAT: meeting, network design
    • ESS: SUNET is talking to local ESS IT in Lund about connectivity; SWAMID it talking to them about membership.  They seem to have some budget for networking.  SUNET is considering fibre access to the instrument sites.  Their data centre building is Copenhagen is coming along. 
    • DeIC: 
      • data.deic.dk moving from pilot to production. 
      • Optical network procurement:  Pre-qualitification completed: Ciena, Cisco, ECI, ADVA, Nokia.  Offers due 6 June.  Contract August, deployment 2h 2016.
    • RHnet:
      • 10G upgrades to non-Reykjavik campuses coming this summer. 
      • Danish met office HPC facility has gone live, connected to RHnet.  Production run so far with about 1 Gbps. 
  • AOB
    • NTW2017 dates set:  Sep. 12-14, Radisson park inn, Copenhagen.
    • NDN2016 registration is open.

Actions

  • JK / LF to make proposal for strategt brainstorm workshop, for NDN board.
  • LF to put Data Analytics on a future CTO F2F
  • LF/VF to talk to Anders and Tom about creating Nordic Wifi Group.
  • LF to consider "Nordic WG framework", at first for Nordic Wifi Group.