Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
div

Unscheduled:

  • November 19th: We had several outages in Umeå due to two faulty cards in our transmission equipment. The cards were replaced and that solved the problem.
  • November 5th: We noticed a few outages on the green link to CSBNET. The reason was a broken M6 transmission card which was replaced.
  • November 1st: Loss of signal on Kiruna - Luleå link was caused by a fiber cut between Kiruna and Poultikasvaara

Scheduled:

  • November 24th: Supplier performed planned maintenance.
  • November 20th: OTDR measurement was performed on the fiber stretch between Boden and Åkroken.
  • November 17th: Interface cards were replaced on a SUNET router in Stockholm (FRE).
  • November 10th: Carrier performed planned maintenance.
  • November 10th: Supplier performed fiber maintenance in Göteborg.
  • November 5th: A faulty controller card was replaced in our DWDM equipment in Göteborg

...