div |
---|
Unscheduled: - September 20th: Fiber cut was fixed by subcontractor.
- September 13th: Link was down due to planned work by supplier.
- September 13th: There was a fiber cut at local carrier in Luleå. This is now fixed.
- September 5th: A power outage in Visby caused loss of connectivity for SUNET customers in Gotland.
Scheduled: - September 30th: SUNET's fiber supplier performed maintenance work on the West Green network in Borås.
- September 23rd: Our supplier performed a planned maintenance between Bålsta and Stockholm.
- September 16th: Our provider performed fiber our supplier performed a planned maintenance in Stockholm
- September 16th: Our supplier had performed a fiber work on the stretch between Luleå and Kiruna
- September 10th: A planned maintenance was performed trying to fix a faulty transmission card, but this maintenance did not fix the problem. Troubleshooting is continuing and a new maintenance will be announced at a later date.
- September 3rd: OTDR measurement was carried out on the south green link between Linköping and Sundhultsbrunn.
- September 2nd: A planned maintenance on Adobe Connect was performed.
|
Scope | Unscheduled | Scheduled | Total |
---|
Hardware | 0 pcs | 1 pcs 00:24 | 1 pcs 00:24 |
---|
Link | 0 4 pcs 3d 10:42 | 5 pcs 14:37 5 | 9 pcs 144d 01:3719 |
---|
None | 4 0 pcs 15:25 | 1 pcs 01:11 | 5 1 pcs 1601:3611
|
---|
Routing | 0 pcs | 0 pcs | 0 pcs |
---|
Software | 0 pcs | 0 pcs | 0 pcs |
---|
|