201209 - Public report
201209 - Public report
Unscheduled:
- September 20th: Fiber cut was fixed by subcontractor.
- September 13th: Link was down due to planned work by supplier.
- September 13th: There was a fiber cut at local carrier in Lule=C3=A5. T=
his is now fixed.
- September 5th: A power outage in Visby caused loss of connectivity for =
SUNET customers in Gotland.
Scheduled:
- September 30th: SUNET's fiber supplier performed maintenance work on th=
e West Green network in Bor=C3=A5s.
- September 23rd: Our supplier performed a planned maintenance between B=
=C3=A5lsta and Stockholm.
- September 16th: Our supplier performed a planned maintenance in Stockho=
lm
- September 16th: Our supplier performed a fiber work on the stretch betw=
een Lule=C3=A5 and Kiruna
- September 10th: A planned maintenance was performed trying to fix a fau=
lty transmission card, but this maintenance did not fix the problem. Troubl=
eshooting is continuing and a new maintenance will be announced at a later =
date.
- September 3rd: OTDR measurement was carried out on the south green link=
between Link=C3=B6ping and Sundhultsbrunn.
- September 2nd: A planned maintenance on Adobe Connect was performed.
Scope |
Unscheduled |
Scheduled |
Total |
Hardware |
0 pcs |
1 pcs 00:24 |
1 pcs 00:24 |
Link |
4 pcs 3d 10:42 |
5 pcs 14:37 |
9 pcs 4d 01:19 |
None |
0 pcs |
1 pcs 01:11 |
1 pcs 01:11 <=
/p> |
Routing |
0 pcs |
0 pcs |
0 pcs |
Software |
0 pcs |
0 pcs |
0 pcs |