- Tele2 reported that they resolved the issue and we had to bounce the interface to restore the interface
- February 12th: The link to DDB was down. We replaced SFP in Happaranda, after that the link came up.
- February 8th: The fiber between Kongsvinger and Gaustadallé went down due to unannounced maintenance.
- January 28th: One of the links to HV was down. It was caused by a misstake during a FPC replacement.
- January 28th: Router gbg7-r2 had a faulty FPC which was replaced.
Scheduled: - February 25th: RAMAN amplifier in Kongsvinger was recalibrated.
- February 22nd: Amplifier module was replaced in the optical equipment in Hallsberg.
- February 17th: SUNET performed planned fiber maintenance in Näsviken, Hällsjö and Sundsvall.
- February 17th: SUNET performed planned fiber work in Sundsvall.
- February 16th: SUNET performed planned fiber maintenance in Vittersjö and Glössbo.
- February 15th: Supplier performed cable splicing in Kungsbacka.
- February 11th: SUNET performed planned fiber maintenance in Gävle.
- February 11th: Router gu-r2 was replaced with a new router.
- February 11th: SUNET performed planned fiber maintenance in Uppsala.
- February 8th: Supplier performed cable maintenance in Göteborg, rerouting due to Västlänken.
- February 8th: RAMAN amplifier in Kongsvinger was recalibrated.
- February 8th: SUNET will carry out work on fiber in Stockholm.
- February 8th: SUNET carried out work on fiber in Odensala.
- February 8th: SUNET carried out work on fiber in Untra.
- February 7th: Supplier performed an emergency cable maintenance.
- February 4th: Router gu-r1 was replaced with a new router.
- February 4th: Fiber provider performed an emergency cable repair on the fiber stretch between Luleå and Piteå.
- January 25th: SUNET checked the fiber patch connecting our amplifiers in site HAB3, Hallsberg.
|
Scope | Unscheduled | Scheduled | Total |
---|
Hardware | 2 pcs 1d 11:26 |
---|
|