202102 - Public report
202102 - Public report
Unscheduled:
- February 24th: IDP for SUNET employees and VR was unavailable for a sho=
rt period of time making it impossible to login. Did not affect other IDP's=
.
- February 13th: A core link between Sk=C3=B6vde and =C3=96rebro was down=
. The reason was a faulty FPC which was replaced.
- February 12th: The link to DDB went down. Tele2 reported that they reso=
lved the issue and we had to bounce the interface to restore the interface<=
/li>
- February 12th: The link to DDB was down. We replaced SFP in Happaranda,=
after that the link came up.
- February 8th: The fiber between Kongsvinger and Gaustadall=C3=A9 went d=
own due to unannounced maintenance.
- January 28th: One of the links to HV was down. It was caused by a misst=
ake during a FPC replacement.
- January 28th: Router gbg7-r2 had a faulty FPC which was replaced.
Scheduled:
- February 25th: RAMAN amplifier in Kongsvinger was recalibrated.
- February 22nd: Amplifier module was replaced in the optical equipment i=
n Hallsberg.
- February 17th: SUNET performed planned fiber maintenance in N=C3=A4svik=
en, H=C3=A4llsj=C3=B6 and Sundsvall.
- February 17th: SUNET performed planned fiber work in Sundsvall.
- February 16th: SUNET performed planned fiber maintenance in Vittersj=C3=
=B6 and Gl=C3=B6ssbo.
- February 15th: Supplier performed cable splicing in Kungsbacka.
- February 11th: SUNET performed planned fiber maintenance in G=C3=A4vle.=
- February 11th: Router gu-r2 was replaced with a new router.
- February 11th: SUNET performed planned fiber maintenance in Uppsala.
- February 8th: Supplier performed cable maintenance in G=C3=B6teborg, re=
routing due to V=C3=A4stl=C3=A4nken.
- February 8th: RAMAN amplifier in Kongsvinger was recalibrated.
- February 8th: SUNET will carry out work on fiber in Stockholm.
- February 8th: SUNET carried out work on fiber in Odensala.
- February 8th: SUNET carried out work on fiber in Untra.
- February 7th: Supplier performed an emergency cable maintenance.
- February 4th: Router gu-r1 was replaced with a new router.
- February 4th: Fiber provider performed an emergency cable repair on the=
fiber stretch between Lule=C3=A5 and Pite=C3=A5.
- January 25th: SUNET checked the fiber patch connecting our amplifiers i=
n site HAB3, Hallsberg.
Scope |
Unscheduled |
Scheduled |
Total |
Hardware |
2 pcs 1d 11:26 |
1 pcs 00:02 |
3 pcs 1d 11:28 |
Link |
3 pcs 2d 19:28 |
9 pcs 06:49 |
12 pcs 3d 03:17 |
None |
2 pcs 02:27 |
8 pcs 06:41 |
10 pcs 09:08 |
Routing |
0 pcs |
0 pcs |
0 pcs |
Software |
0 pcs |
0 pcs |
0 pcs |