Unscheduled:

  • December 15th: Router was down due to a module became disabled.
  • December 3rd: There was a fiber break between Junosuando and Kiruna. Fiber has been repaired and the link has restored.
  • November 30th: We had an issue with Eidas which was later resolved.

Scheduled:

  • December 17th: Planned work finalized by service provider which affected SUNET core connection between Norrtjärn and Tuggen.
  • December 16th: Carrier performed fibre maintenance on the link between Tuggen and Vargfors.
  • December 12th: Carrier performed fibre maintenance on the link between Tuggen and Vargfors.
  • December 9th: Carrier performed fibre maintenance on the link between Vargfors and Åkroken.
  • December 5th: Supplier performed fiber maintenance between the stretch Kalix and Luleå

Scope

Unscheduled

Scheduled

Total

Hardware

0 pcs

0 pcs

0 pcs

Link

0 pcs

2 pcs 11:04

2 pcs 11:04

None

3 pcs 1d 04:14

3 pcs 09:19

5 pcs 1d 13:33

Routing

0 pcs

0 pcs

0 pcs

Software

0 pcs

0 pcs

0 pcs