Unscheduled:
- February 23rd: Short link flap at 08:00 UTC. Probably caused by technician on site doing another maintenance.
- February 15th: Both link towards MDH netcenter was down. Solved by MDH rebooting their routers.
- February 14th: A massive power outage in Visby caused loss of connectivity to Visby customers.
- February 9th: This corresponds to a known-bug PR931755 which is fixed in the next-release of software we will deploy on this node.
Scheduled:
- February 24th: Transmission card (F-10T) and XFP change in 4200 (AR_421_HIK) at LNU Kalmar
Scope | Unscheduled | Scheduled | Total |
---|---|---|---|
Hardware | 1 pcs 13:24 | 1 pcs 00:30 | 2 pcs 13:54 |
Link | 0 pcs | 0 pcs | 0 pcs |
None | 3 pcs 2:23 | 0 pcs | 3 pcs 2:23 |
Routing | 0 pcs | 0 pcs | 0 pcs |
Software | 0 pcs | 0 pcs | 0 pcs |