Unscheduled:

  • November 25th: A faulty card caused node to power restart. Faulty card has been replaced.
  • November 23: Red and Green link to CTH was down due a planned work on Green link and a fault on the Red link.
  • November 7th: An equipment in Listlena was down due to power problems on site. This has now been resolved.
  • November 7th: There was an outage on the south green network due to an unannounced planned maintenance by carrier.
  • November 3rd: There was a power restart on the main card on the node SR_421_K_OH. Solved by replacing the card.
  • November 2nd: SH link was down due to power problems at customers site.
  • November 1st: The redundancy link between lnu-br1 and lnu-br2 was flapping. No further flaps detected.
  • November 1st: md.nordu.net was not working. Solved by reboot.
  • October 30th: There was an outage on the south green network due to an unannounced planned maintenance by carrier.
  • November 11th: We had a degraded signal on the circuit to Luleå. After being moved to a new fiber pair all levels are ok.

Scheduled:

  • November 19th: Carrier performed a planned maintenance to resplice fiber on the circuit between Karlstad and Hanebol.
  • November 16th: Subcontractor performed a resplice of dark-fiber between Norrköping and Linköping.

Scope

Unscheduled

Scheduled

Total

Hardware

1 pcs 00:05

0 pcs

1 pcs 00:05

Link

4 pcs 16:58

2 pcs 04:02

6 pcs 21:00

None

5 pcs 10:01

0 pcs

5 pcs 10:01

Routing

0 pcs

0 pcs

0 pcs

Software

0 pcs

0 pcs

0 pcs

  • No labels