Unscheduled:

  • September 25th: There was an outage on the green link to Örebro due to an unexpected restart of a transmission card. We have monitored this for 4 days now and no new restarts has occured.
  • September 14th: We had a fibre damage between Norsholm and Linköping on the south red network. Supplier fixed the fibre.
  • August 31st: A faulty transmission card in the node in Stockholm caused multiple outages on the green link to HKR.

Scheduled:

  • September 26th: Supplier performed cable maintenance.
  • September 23rd: A planned ODTR measurement was preformed in order to troubleshoot a degraded signal in a DWDM in Karlstad on the west red network.
  • September 15th: Carrier performed a planned maintenance.
  • September 14th: Carrier performed a planned maintenance.

Scope

Unscheduled

Scheduled

Total

Hardware

1 pcs 00:07

0 pcs

1 pcs 00:07

Link

1 pcs 2d 07:20

3 pcs 01:27

4 pcs 2d 08:47

None

1 pcs 00:11

1 pcs 02:10

2 pcs 02:21

Routing

0 pcs

0 pcs

0 pcs

Software

0 pcs

0 pcs

0 pcs

  • No labels