Unscheduled:
- July 29th: There is a planned event to repair a fiber between Borlänge and Hoforshus
- July 21st: Fibre-break to LTU green link, circuit repaired and both links is currently accepting traffic again.
Scheduled:
- July 16th: Our fiber supplier switch fiber pair due to a degrade signal
- July 10th: An OTDR measurement was performed on the fiber stretch between Hanebol and Karlstad.
- July 8th: An amplifier was replaced in the transmission node in Karlstad.
- July 7th: An amplifier was replaced in the transmission node in Hanebol.
- July 4th: A transponder was replaced in Gävle due to intermittent errors.
- July 2nd: We had a slightly degraded signal in a DWDM in Karlstad on the west red network. Intrusive troubleshooting got performed on site. Fiber got cleaned and one suspicious 1db damper (actually 3db damping) on the rx got removed.
- July 2nd: A transponder was replaced du to intermittent errors
Scope | Unscheduled | Scheduled | Total |
---|---|---|---|
Hardware | 0 pcs | 0 pcs | 0 pcs |
Link | 1 pcs 2d 03:09 | 1 pcs 02:39 | 2 pcs 2d 05:48 |
None | 1 pcs 01:58 | 6 pcs 01:28 | 7 pcs 03:26 |
Routing | 0 pcs | 0 pcs | 0 pcs |
Software | 0 pcs | 0 pcs | 0 pcs |