Unscheduled:
- June 18th: An unannounced maintenance caused outages on SUNET backbone link and NDGF Umeå link.
- June 10th: Port Reset restored the BGP to CSB - Red. We will monitor this so the interface doesn't "hang" again.
- June 9th: Unannounced maintenance Stockholm to Örebro.
- June 4th: There was a fiber break between Örebro and Borlänge. The fiber has been repaired.
Scheduled:
- June 10th: Planned maintenance affecting LNU Red
Scope | Unscheduled | Scheduled | Total |
---|---|---|---|
Hardware | 0 pcs | 0 pcs | 0 pcs |
Link | 0 pcs | 0 pcs | 0 pcs |
None | 4 pcs 1d 12:45 | 1 pcs 00:23 | 5 pcs 1d 13:08 |
Routing | 0 pcs | 0 pcs | 0 pcs |
Software | 0 pcs | 0 pcs | 0 pcs |