Unscheduled:
- January 29th: The green link to Örebro suffered an outage due to a fiber cut in suppliers network.
- January 16th: There was a short outage in the south red network, RFO was not found.
- January 16th: A broken amplifier in Tuggen caused an outage on the north red network between Tuggen and Umeå. The faulty amplifier was replaced.
- January 8th: There was an outage on SUNET north red network due to a fiber break in Sollentuna.
Scheduled:
- January 29th: We did a software upgrade on a transmission node in the west red network in Västerås.
- January 27th: Supplier performed a fiber control due to a signal degradation and found a broken attenuator that was replaced.
- January 20th: Hardware replacement was done to clear equipment failure alarms in one of our DWDM nodes in Växjö.
Scope | Unscheduled | Scheduled | Total |
---|---|---|---|
Hardware | 0 pcs | 2 pcs 00:16 | 2 pcs 00:16 |
Link | 4 pcs 1d 03:10 | 1 pcs 00:02 | 5 pcs 1d 03:12 |
Routing | 0 pcs | 0 pcs | 0 pcs |