Unscheduled:

  • February 22nd: We have lost connectivity with multiple hosts in IAAS. Problem has been resolved.
  • February 7th: SUNET backbone link between Trollhättan and Göteborg was down due to an unannounced fiber maintenance.
  • February 6th: Router slu-r2 was unreachable due to a system crash under the transfer of the new software image to the router.
  • February 4th: We had loss of signal between Gällivare and Kiruna. The reason was a bad fiber in Gällivare which was replaced.

Scheduled:

  • February 27th: Fiber supplier performed maintenance Göteborg, affected our link between our router gbg7-r2 and Netnod.
  • February 26th: Supplier performed maintenance due to construction work.
  • February 22nd: A FPC in the router upa-r1 was rebooted.
  • February 20th: Fiber provider performed a planned fiber move due to construction of a bridge. Affecting our link between Göteborg and Trollhättan.
  • February 14th: We did troubleshooting on a fiber loss high alarm in an optical node in site Näsviken.
  • February 11th: The service provider performed an upgrade on their ethernet and IP capacity network.
  • February 6th: The following routers were upgraded to a newer software version: slu-r2, slu-ume-r2, sh-r2, vsby-r2.
  • February 5th: The following routers was upgraded to a newer software version: kth-r3, hhs-r1, gih-r1.
  • February 1st: The following routers was upgraded to a newer software version: slu-r1, slu-ume-r1, sh-r1, vsby-r1.

Scope

Unscheduled

Scheduled

Total

Hardware

0 pcs

3 pcs 07:59

3 pcs 07:59

Link

1 pcs 1d 10:42

3 pcs 1d 00:09

4 pcs 2d 10:51

None

1 pcs 02:04

3 pcs 00:28

4 pcs 02:32

Routing

0 pcs

0 pcs

0 pcs

Software

2 pcs 02:51

0 pcs

2 pcs 02:51