Unscheduled:

  • 22.06.2011 05:14 UTC - The were outages in the SUNET core caused faulty transmission card. After replacement of the F-10 card in the node NG_421_Kl_Cy, the interface has been stable.
  • 10.06.2011 04:08 UTC - There were two brief outages on the SUNET south red network. No RFO could be established.
  • 14.06.2011 09:18 UTC - A node in the SUNET core rebooted due to power failure caused by an unannounced maintenance on site.

Scheduled:

  • 15.06.2011 15:58 UTC - A maintenance was performed to restore management of SG_421_Mun_Ov. However, due to a corrupt flashcard there were complications and the maintenance took longer than expected and the node is currently running with an older software version. The resulting outage affected Högskolan i Halmstad.
  • 22.06.2011 15:32 UTC - Fiberwork was carried out in Ronneby by TDCs subcarrier affecting Högskolan i Kristianstad, Lunds Universitet, Malmö Högskola, Linnéuniversitetet and the SUNET core.
  • 22.06.2011 15:32 UTC - Fiberwork was carried out in Ronneby by TDCs subcarrier affecting Linnéuniversitetet, Blekinge Tekniska Högskola and the SUNET core.
  • 27.06.2011 11:58 UTC - Planned maintenance was performed to upgrade GSIX's green connection causing a brief outage.

Scope

Unscheduled

Scheduled

Total

Hardware

2 pcs 2d 00:42

0 pcs

2 pcs 2d 00:42

Link

0 pcs

3 pcs 10:17

3 pcs 10:17

None

1 pcs 00:02

2 pcs 05:31

3 pcs 05:33

Routing

0 pcs

0 pcs

0 pcs

Software

0 pcs

1 pcs 01:07

1 pcs 01:07