Unscheduled:
- September 20th: Fiber cut was fixed by subcontractor.
- September 13th: Link was down due to planned work by supplier.
- September 13th: There was a fiber cut at local carrier in Luleå. This is now fixed.
- September 5th: A power outage in Visby caused loss of connectivity for SUNET customers in Gotland.
Scheduled:
- September 30th: SUNET's fiber supplier performed maintenance work on the West Green network in Borås.
- September 23rd: Our supplier performed a planned maintenance between Bålsta and Stockholm.
- September 16th: Our provider performed fiber our in Stockholm
- September 16th: Our supplier had performed a fiber work on the stretch between Luleå and Kiruna
- September 10th: A planned maintenance was performed trying to fix a faulty transmission card, but this maintenance did not fix the problem. Troubleshooting is continuing and a new maintenance will be announced at a later date.
- September 3rd: OTDR measurement was carried out on the south green link between Linköping and Sundhultsbrunn.
- September 2nd: A planned maintenance on Adobe Connect was performed.
Scope |
Unscheduled |
Scheduled |
Total |
Hardware |
0 pcs |
1 pcs 00:24 |
1 pcs 00:24 |
Link |
0 pcs |
5 pcs 14:37 |
5 pcs 14:37 |
None |
4 pcs 15:25 |
1 pcs 01:11 |
5 pcs 16:36 |
Routing |
0 pcs |
0 pcs |
0 pcs |
Software |
0 pcs |
0 pcs |
0 pcs |