Unscheduled:
- November 29th: The ethernet capacity link for RA between Stockholm and Fränsta was down due to fiber cut which is fixed now.
- November 28th: Users experienced intermittent problems with Kaltura between 03:00-08:00 local time. Problem has been resolved.
- November 26th: The backbone link between Växjö and LNU was down. The link is fixed by the fiber provider.
- November 16th: We experienced a link down between Kolbotten (KOB1) and Hedenlunda (HDA). The fiber has been repaired and the link is up again.
- November 15th: The link between Kalmar and Kalrskrona were down.
The link between BTH2 and Kalmar were down. The reason was power outage in the site BKA.
- November 10th: The backbone link between Västerås and Stockholm went down due to hardware issue. Hardware changed and link back up again.
Scheduled:
- November 25th: Supplier performed maintenance on their network. This applied to the stretch between KIR2 (Rensjön) and KIR3 (Kiruna).
- November 25th: Supplier performed fiber works between KIR4 (Svappavaara) and PAJ1 (Junosuando).
- November 24th: A power maintenance was performed at HKRT campus affecting HKR2 router.
- November 21st: We performed reseat and reboot of amplifier in AJR2
|
Scope |
Unscheduled |
Scheduled |
Total |
Hardware |
1 pcs 06:17 |
2 pcs 06:09 |
3 pcs 12:26 |
Link |
4 pcs 6d 23:48 |
2 pcs 09:21 |
6 pcs 7d 09:09 |
None |
1 pcs 04:59 |
0 pcs |
1 pcs 04:59 |
Routing |
0 pcs |
0 pcs |
0 pcs |
Software |
0 pcs |
0 pcs |
0 pcs |
|