Unscheduled:
- April 12th: The Adobe connect service for SUNET was unstable due to a broadcast storm in our environment.
- April 8th: All interfaces on umu-r1 flapped and then showed a minor alarm on a controller board. After a re-seat of the controller board the alarm cleared.
- April 3rd: The link to oru-r1 was down. Resolved by restarting the MPC card.
- March 31st: The MPLS - L2C between UU and Campus Gotland went down during the migration of the link to the new switch at Uppsala (uu-sw2). This has now been fixed.
Scheduled:
- April 28th: Routing engine was switched on router jkg-r1.
- April 25th: Carrier performed maintenance on the connection between Gällivare and Jokkmokk.
- April 25th: The core router in Västerås was upgraded to a new software release.
- April 24th: The controller board on router hb-r2 was re-seated to clear the alarm.
- April 12th: Control board on router umu-r1.sunet.se was reseated and the fiber between umu-r1 and the POP was measured. The router is alarm free now.
- April 7th: We removed the debug image from the router in Trollhättan, hv-r1.
- April 7th: A card was restarted in the Karlstad router in order to fix an alarm.
|
Scope |
Unscheduled |
Scheduled |
Total |
Hardware |
1 pcs 00:03 |
2 pcs 00:22 |
3 pcs 00:25 |
Link |
2 pcs 6d 05:18 |
2 pcs 03:35 |
4 pcs 6d 08:53 |
None |
0 pcs |
2 pcs 00:24 |
2 pcs 00:24 |
Routing |
1 pcs 02:24 |
1 pcs 00:45 |
2 pcs 03:09 |
Software |
0 pcs |
0 pcs |
0 pcs |
|