Unscheduled:
- December 15th: We had a loss of signal in Litslena in old OPTOSUNET network. The problem has now been fixed.
- December 6th: The link between Narvik-Luleå was flapping. The reason was a bad fiber between Hakkas and Överkalix which was replaced with another fiber pair.
Scheduled:
- December 15th: A planned maintenance was carried out on RAMAN in Sundsvall.
- December 13th: Supplier performed maintenance on the old OPTOSUNET fiber in Växjö.
- December 8th: Supplier performed a planned rerouting of cable maintenance due to construction work, Stockholm.
- December 2nd: IPNett and ADVA troubleshooted pending NMS issues.
|
Scope |
Unscheduled |
Scheduled |
Total |
Hardware |
0 pcs |
0 pcs |
0 pcs |
Link |
1 pcs 19:41 |
3 pcs 04:53 |
4 pcs 1d 00:34 |
None |
1 pcs 06:54 |
1 pcs 01:57 |
2 pcs 08:51 |
Routing |
0 pcs |
0 pcs |
0 pcs |
Software |
0 pcs |
0 pcs |
0 pcs |
|