{div}
Unscheduled:
* August 29th: There was an outage in the West Green network caused by human error at a site in Göteborg. 
* August 28th: There was an outage in the West Red network caused by construction work in Borås.
* August 2nd: There were outage in the North Red network caused by faulty transmission equipment.

Scheduled:
* August 29th: Planned fiber work was performed on the stretch between Boden and Åkroken in the North Red network. 
* August 28th: Planned fiber work was performed on the stretch between Örebro and Löa in the West Green network.
* August 27th: A transmission card was replaced in Stockholm.
* August 26th: Our provider has performed fiber maintenance in Stockholm.
* August 21st: Fiber circuits have been rerouted in Älmhult in the South Green network.
* August 4th: The Adobe Connect system was upgraded to version 8.2.2.
* August 1st: A faulty FPC card has been replaced on a SUNET router in Stockholm.
{div}

Scope

Unscheduled

Scheduled

Total

Hardware

1 pcs 3d 17:49

2 pcs 00:14

3 pcs 3d 18:03

Link

2 pcs 03:57

4 pcs 03:55

6 pcs 07:52

None

0 pcs

0 pcs

0 pcs

Routing

0 pcs

0 pcs

0 pcs

Software

0 pcs

1 pcs 05:11

1 pcs 05:11