Unscheduled:

  • January 20th: The backbone link between Göteborg - Trollhättan had a short flap. RFO unknown.
  • January 15th: Problems with FPC-card in router kka8-r1. Solved with replacement of hardware.
  • January 12th: RISE CPE alp-c1.sunet.se in Alnarp went down. This was due to a power outage.
  • January 10th: Provider performed rerouting of cables due to construction. This affected the link between Göteborg - Stenkullen.
  • January 2nd: We had links flapping on FPC0 in oru-r1. The issues was caused by high temperatures. We solved the issue by removing the fan package and cleaning the filters.
  • December 31st: We lost connection with the CPE vxj-c1 for RISE Växjö. This was caused by a broken switchport on the access switch belonging to Tele2.

Scheduled:

  • January 17th: Fiber provider performed cable splicing in Kristianstad.
  • January 12th: Provider relocated fiber cables due to construction work. This affect the link between Tulegatan - Stockholms Universitet.
  • January 12th: Provider performed planed maintenance to change amplifier in site Årnäs. Maintenance affected link between Oslo - Kongsvinger.


Scope

Unscheduled

Scheduled

Total

Hardware

1 pcs 2d 03:39

0 pcs

1 pcs 2d 03:39

Link

5 pcs 5d 02:23

3 pcs 21:24

8 pcs 5d 23:47

None

0 pcs

0 pcs

0 pcs

Routing

0 pcs

0 pcs

0 pcs

Software

0 pcs

0 pcs

0 pcs