You are viewing an old version of this page. View the current version.
Compare with Current
View Page History
Version 1
Next »
Unscheduled:
- June 21st: The link between Kiruna and Svappavaara was down due to a fiber cut in Kiruna.
- June 21st: One of the links to IRF in Kiruna was down. It was due to fiber cut in Kiruna which is resolved now.
- June 7th: The link between lu-r2 and mcen1-r1 was down due to an unannounced planned maintenance.
- June 7th: MDVPN service to KI in Hong Kong was down because of wrong configurations in the routers.
Scheduled:
- June 28th: Adobe Connect was upgraded to 9.8.0.1.
- June 14th: A re-seat of a card on the optical node at Borlänge was performed.
- June 14th: Carrier performed a planned fibre maintenance between Holmagärde and Halmstad.
- June 13th: We performed a re-seat of a card on the optical node at Trolhättan.
- June 12th: Emergency maintenance was performed on the optical node in Bergkvara to resolve the faulty card issue.
- June 12th: Our supplier performed an emergency maintenance on their network due to extensive works which involves the construction of new electrical substations that are being built in Porjus and Harsprånget.
- June 11th: Fiber provider performed planned fiber maintenance.
- June 11th: Hardware provider performed a re-seat of a card on the optical node at Alvesta (AVA3)
- June 7th: The maintenance was not successful at this time and is postponed.
Scope |
Unscheduled |
Scheduled |
Total |
Hardware |
0 pcs |
2 pcs 03:10 |
2 pcs 03:10 |
Link |
4 pcs 11:09 |
3 pcs 13:26 |
7 pcs 1d 00:35 |
None |
0 pcs |
3 pcs 00:03 |
3 pcs 00:03 |
Routing |
0 pcs |
0 pcs |
0 pcs |
Software |
0 pcs |
1 pcs 01:15 |
1 pcs 01:15 |