Unscheduled:

  • January 27th: Switch connected to server hosting service was rebooted.
  • January 16th: One of the links to LNU in Växjö was down. The link restored after restart of the interface card.
  • January 11th: FPC 0 on ltu-r1 went offline that caused a short outage for LTU. Reseat of the FPC resolved the issue.
  • November 17th: All the FPCs on router hh-r2 lost connectivity to the routing engine for a short time. No cause found yet, supplier still investigating the issue.

Scheduled:

  • January 27th: A switch in TUG was rebooted.
  • January 18th: Cleaning was done on one of the MDH links
  • January 17th: An emergency maintenance on Sunet Adobe Connect system was performed.
  • January 9th: The transmission component at Eskilstuna which reported a "voltage out of a range" alarm was replaced.

Scope

Unscheduled

Scheduled

Total

Hardware

2 pcs 00:38

2 pcs 00:16

4 pcs 00:54

Link

1 pcs 00:26

0 pcs

1 pcs 00:26

None

1 pcs 1d 00:35

2 pcs 01:08

3 pcs 1d 01:43

Routing

0 pcs

0 pcs

0 pcs

Software

0 pcs

0 pcs

0 pcs