You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 4 Next »

Unscheduled:

  • October 21st: A transponder card was overheated due to fan failure in the equipment which caused traffic to drop. After the card and fans was replaced traffic was restored.

Scheduled:

  • October 6th: Supplier performed a planned maintenance between Bålsta and Stockholm.
  • October 6th: More storage space was added on SUNET Adobe Connect shared storage.

Scope

Unscheduled

Scheduled

Total

Hardware

1 pcs 1d 03:38

0 pcs

1 pcs 1d 03:38

Link

0 pcs

1 pcs 01:39

1 pcs 01:39

None

0 pcs

0 pcs

0 pcs

Routing

0 pcs

0 pcs

0 pcs

Software

0 pcs

1 pcs 00:04

1 pcs 00:04

  • No labels