Unscheduled:

  • November 23rd: The router ltu-r2 was unreachable due to a power outage at the customer´s site.
  • November 23rd:Box login problems is solved.
  • November 20th: The connection to Filipstad (fls-r1) was unavailable for some minutes during the night due to unannounced maintenance.
  • November 11th: The router in Orebro, lba-r1, was affected by a FCP issue. The FPC has been stable since last reboot.

 

Scheduled:

  • November 27th: Supplier carried out fiber work on the stretch between Lyby and Lund.
  • November 26th: Supplier performed maintenance on the link between Växjö and Visby.
  • November 20th: Carrier performed fiber maintenance between Malmö and Tomelilla.
  • November 14th: A router in Stockholm was upgraded to a new software release.
  • November 13th: A router in Stockholm was upgraded to a new software release.
  • November 13th: SUNET performed software upgrade on our core router in Luelå.
  • November 10th: SUNET performed software upgrade on core routers. The routers are klx1-r1, klx2-r1, upa-r1, nkg188-r1, kka8-r1 and lnd88-r1.
  • November 10th: SUNET performed planned software upgrade on core routers. The routers affected were kir3-r1, ske109-r1, kmr88-r1, fsn2-r1, kir3-r2 and ume8-r1.
  • November 9th: A router in Stockholm was upgraded to a new software release.
  • November 9th: SUNET performed software upgrade on core routers. The routers are sva-r1, fln4-r1, kar-r1, gbg7-r1, mcen-r1, lin3-r1 and kir5-r1.
  • November 9th: SUNET performed software upgrade on core routers. The routers are sbo-r1, lba-r1, trh-r1, hsd-r1, vxj-r1 and bos-r1.
  • November 8th: Carrier performed a planned fibre maintenance between Norrköping and Linköping.
  • November 8th: A router in Stockholm was upgraded to a new software release.
  • November 8th: SUNET performed software upgrade on core routers.
  • November 7th: Supplier performed maintenance in a power cable affecting the link between Falun and Furudal.
  • November 1st: Provider performed a planned fiber maintenance in Lund.

Scope

Unscheduled

Scheduled

Total

Hardware

0 pcs

1 pcs 00:12

1 pcs 00:12

Link

1 pcs 00:56

6 pcs 19d 15:37

7 pcs 19d 16:33

None

1 3 pcs 0001:0934

3 pcs 00:434

6 pcs 0002:5217

Routing

0 pcs

0 pcs

0 pcs

Software

0 pcs

6 pcs 03:22

6 pcs 03:22