Unscheduled:

  • August 28th: There was an outage on SUNET west green affecting the redundancy towards Mälardalens Högskola. The issue was a faulty card in a transmission node which was replaced.July 15th: Multiple outages were
  • noticed in South Red network. The problem was fixed by changing the fiber in amplifier sites.August 26th: There was an outage on the north red network caused by equipment failure on a node in Uppsala. 

Scheduled:

  • August 25th: The Two transponder cards were replaced in transmission nodes in Västerås.
  • August 23rd: A service affecting work was carried out in order restore the management on a node in Växjö.
  • August 1st: An emergency maintenance was performed on the south red network to troubleshoot recent issues tracked in SUNETTICKET-1433.

Scope

Unscheduled

Scheduled

Total

Hardware

0 2 pcs 3d 21:19

1 2 pcs 0002:1450 1

4 pcs 4d 00:1409

Link

1 0 pcs 01:04

2 1 pcs 0200:4206

3 1 pcs 0300:4606

None

1 0 pcs 1d 07:46

0 pcs

1 0 pcs 1d 07:46

Routing

0 pcs

0 pcs

0 pcs

Software

0 pcs

0 pcs

0 pcs