Unscheduled:

  • March 4th: There was a brief outage in the North Red network between Boden and Åkroken, caused by human error on site.

Scheduled:

  • March 27th: A transmission card was changed in a transmission equipment in Tuggen.
  • March 26th: Supplier performed an OTDR measurement between Boden and Åkroken.
  • March 24th: Supplier performed fiber maintenance on the West Green network in Göteborg.
  • March 22nd: We replaced a broken card in a transmission equipment on the red network.
  • March 21st: Supplier performed a planned OTDR measurement between Boden and Luleå.
  • March 20th: A planned maintenance to move some equipment to UPS/generator power at LNU was performed.
  • February 28th: Planned maintenance was performed by SUNET's fiber supplier on the stretch between Boden and Åkroken.

Scope

Unscheduled

Scheduled

Total

Hardware

0 pcs

2 pcs 02:15

2 pcs 02:15

Link

0 pcs

5 pcs 1d 14:47

5 pcs 1d 14:47

None

1 pcs 00:01

0 pcs

1 pcs 00:01

Routing

0 pcs

0 pcs

0 pcs

Software

0 pcs

0 pcs

0 pcs