div |
---|
Unscheduled: - 22.06.2011 05:14 UTC - The were outages in the SUNET core caused faulty transmission card. After replacement of the F-10 card in the node NG_421_Kl_Cy, the interface has been stable.
- 10.06.2011 04:08 UTC - There were two brief outages on the SUNET south red network. No RFO could be established.
- 14.06.2011 09:18 UTC - A node in the SUNET core rebooted due to power failure caused by an unannounced maintenance on site.
Scheduled: - 15.06.2011 15:58 UTC - A maintenance was performed to restore management of SG_421_Mun_Ov. However, due to a corrupt flashcard there were complications and the maintenance took longer than expected and the node is currently running with an older software version. The resulting outage affected Högskolan i Halmstad.
- 22.06.2011 15:32 UTC - Fiberwork was carried out in Ronneby by TDCs subcarrier affecting Högskolan i Kristianstad, Lunds Universitet, Malmö Högskola, Linnéuniversitetet and the SUNET core.
- 22.06.2011 15:32 UTC - Fiberwork was carried out in Ronneby by TDCs subcarrier affecting Linnéuniversitetet, Blekinge Tekniska Högskola and the SUNET core.
- 23.03.2011 16:11 UTC - Due to a software bug in a few nodes in our transmission network we needed to perform software downgrades.
- 27.06.2011 11:58 UTC - Planned maintenance was performed to upgrade GSIX's green connection . The maintenance is complete and connectivity restoredcausing a brief outage.
|
Scope | Unscheduled | Scheduled | Total |
---|
Hardware | 2 pcs 2d 00:42 | 0 pcs | 2 pcs 2d 00:42 |
---|
Link | 0 pcs | 3 pcs 10:17 | 3 pcs 10:17 |
---|
None | 1 pcs 00:02 | 2 pcs 05:31 | 3 pcs 05:33 |
---|
Routing | 0 pcs | 0 pcs | 0 pcs |
---|
Software | 0 pcs | 1 pcs 01:07 | 1 pcs 01:07 |
---|
|