- It was cleared by performing a vmhost reboot.
- August 4th: Ethernet capacity link to Ramsele, RA was down due to an unannounced maintenance.
- August 3rd: There was a high attenuation in the fiber stretch from Kongsvinger towards Jössefors. The fiber pair was changed to fix the high attenuation.
- June 30th: The stretch between Jossefors and Kongsvinger was affected due to a fiber issue on sub-carrier´s network.
- March 25th: The circuit between KGV11 and GAUS23 has normalized after the replacement of ROADM in GAUS23.
Scheduled: - August 27th: Supplier moved the fiber due to construction of power substation.
- August 26th: Supplier performed a cable relocation in Mellerud.
- August 26th: The affected wavelengths for the planned work SUNETTICKET-6556 were re-routed.
- August 20th: Fiber provider performed fiber testing.
- August 20th: Fiber provider performed fiber testing.
- August 19th: Fiber provider will perform fiber testing
- August 17th: Provider performed software upgrade.
- August 17th: We performed emergency maintenance to recover amplifier node in Örebro.
- August 17th: The following core routers was upgraded sbo-r1, kar1-r1, bos-r2, ksd1-r1
- August 12th: Our supplier performed an emergency cable repair on a sea cable between Helsingborg, Sweden and Helsingör, Denmark
- August 12th: SUNET re-calibrated the RAMAN amplification on the fiber stretch between Oslo (HMG9) and Rakkestad (NOR1202).
- August 11th: Fiber provider performed fiber testing.
- August 6th: ROADM replaced at GAUS23.
- August 5th: We replaced a faulty card on the optical equipment in Växjö in order to mitigate a flapping link.
- August 5th: Supplier performed cable splicing due to construction of power substation.
- August 4th: Supplier performed work on the fiber stretch in the sites between Storfinnforsen (SFF) and Midskog (MID1).
- August 4th: We performed a hardware maintenance on the optical equipment in Växjö in order to troubleshoot a flapping link.
- August 4th: Supplier performed cable splicing due to construction of power substation. Maintenance is performed during day due to security for the technicians. This affected the fiber stretch between MID1(Midskog) and OSD(Östersund).
- July 31st: We performed a hardware maintenance on the optical equipment in Växjö i n order to troubleshoot a flapping link. The maintenance was incomplete.
- July 28th: ROADM in GAUS23(Oslo)was restarted.
|
Scope | Unscheduled | Scheduled | Total |
---|
Hardware |
---|
|