{div}
Unscheduled:
* September 20th: Fiber cut was fixed by subcontractor.
* September 13th: Link was down due to planned work by supplier.
* September 13th: There was a fiber cut at local carrier in Luleå. This is now fixed.
* September 5th: A power outage in Visby caused loss of connectivity for SUNET customers in Gotland.
Scheduled:
* September 30th: SUNET's fiber supplier performed maintenance work on the West Green network in Borås.
* September 23rd: Our supplier performed a planned maintenance between Bålsta and Stockholm.
* September 16th: Our supplier performed a planned maintenance in Stockholm
* September 16th: Our supplier performed a fiber work on the stretch between Luleå and Kiruna
* September 10th: A planned maintenance was performed trying to fix a faulty transmission card, but this maintenance did not fix the problem. Troubleshooting is continuing and a new maintenance will be announced at a later date.
* September 3rd: OTDR measurement was carried out on the south green link between Linköping and Sundhultsbrunn.
* September 2nd: A planned maintenance on Adobe Connect was performed.
{div} |