Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Migrated to Confluence 4.0

Excerpt
Wiki Markup
{div}
Unscheduled:
* September 20th: Fiber cut was fixed by subcontractor.
* September 13th: Link was down due to planned work by supplier.
* September 13th: There was a fiber cut at local carrier in Luleå. This is now fixed.
* September 5th: A power outage in Visby caused loss of connectivity for SUNET customers in Gotland.

Scheduled:
* September 30th: SUNET's fiber supplier performed maintenance work on the West Green network in Borås.
* September 23rd: Our supplier performed a planned maintenance between Bålsta and Stockholm.
* September 16th: Our supplier performed a planned maintenance in Stockholm
* September 16th: Our supplier performed a fiber work on the stretch between Luleå and Kiruna
* September 10th: A planned maintenance was performed trying to fix a faulty transmission card, but this maintenance did not fix the problem. Troubleshooting is continuing and a new maintenance will be announced at a later date.
* September 3rd: OTDR measurement was carried out on the south green link between Linköping and Sundhultsbrunn.
* September 2nd: A planned maintenance on Adobe Connect was performed.
{div}
div

Unscheduled:

  • September 20th: Fiber cut was fixed by subcontractor.
  • September 13th: Link was down due to planned work by supplier.
  • September 13th: There was a fiber cut at local carrier in Luleå. This is now fixed.
  • September 5th: A power outage in Visby caused loss of connectivity for SUNET customers in Gotland.

Scheduled:

  • September 30th: SUNET's fiber supplier performed maintenance work on the West Green network in Borås.
  • September 23rd: Our supplier performed a planned maintenance between Bålsta and Stockholm.
  • September 16th: Our supplier performed a planned maintenance in Stockholm
  • September 16th: Our supplier performed a fiber work on the stretch between Luleå and Kiruna
  • September 10th: A planned maintenance was performed trying to fix a faulty transmission card, but this maintenance did not fix the problem. Troubleshooting is continuing and a new maintenance will be announced at a later date.
  • September 3rd: OTDR measurement was carried out on the south green link between Linköping and Sundhultsbrunn.
  • September 2nd: A planned maintenance on Adobe Connect was performed.

    Scope

    Unscheduled

    Scheduled

    Total

    Hardware

    0 pcs

    1 pcs 00:24

    1 pcs 00:24

    Link

    4 pcs 3d 10:42

    5 pcs 14:37

    9 pcs 4d 01:19

    None

    0 pcs

    1 pcs 01:11

    1 pcs 01:11

    Routing

    0 pcs

    0 pcs

    0 pcs

    Software

    0 pcs

    0 pcs

    0 pcs