Excerpt

Unscheduled:

  • August 29th: There was an outage in the West Green network caused by human error at a site in Göteborg.
  • August 28th: There was an outage in the West Red network caused by construction work in Borås.
  • August 2nd: There were outage in the North Red network caused by faulty transmission equipment.

Scheduled:

  • August 29th: Planned fiber work was performed on the stretch between Boden and Åkroken in the North Red network.
  • August 28th: Planned fiber work was performed on the stretch between Örebro and Löa in the West Green network.
  • August 27th: A transmission card was replaced in Stockholm.
  • August 26th: Our provider has performed fiber maintenance in Stockholm.
  • August 21st: Fiber circuits have been rerouted in Älmhult in the South Green network.
  • August 4th: The Adobe Connect system was upgraded to version 8.2.2.
  • August 1st: A faulty FPC card has been replaced on a SUNET router in Stockholm.
    div
    Wiki Markup
    {div}
    Unscheduled:
    * August 29th: There was an outage in the West Green network caused by human error at a site in Göteborg. 
    * August 28th: There was an outage in the West Red network caused by construction work in Borås.
    * August 2nd: There were outage in the North Red network caused by faulty transmission equipment.
    
    Scheduled:
    * August 29th: Planned fiber work was performed on the stretch between Boden and Åkroken in the North Red network. 
    * August 28th: Planned fiber work was performed on the stretch between Örebro and Löa in the West Green network.
    * August 27th: A transmission card was replaced in Stockholm.
    * August 26th: Our provider has performed fiber maintenance in Stockholm.
    * August 21st: Fiber circuits have been rerouted in Älmhult in the South Green network.
    * August 4th: The Adobe Connect system was upgraded to version 8.2.2.
    * August 1st: A faulty FPC card has been replaced on a SUNET router in Stockholm.
    {div}

    Scope

    Unscheduled

    Scheduled

    Total

    Hardware

    1 pcs 3d 17:49

    2 pcs 00:14

    3 pcs 3d 18:03

    Link

    2 pcs 03:57

    4 pcs 03:55

    6 pcs 07:52

    None

    0 pcs

    0 pcs

    0 pcs

    Routing

    0 pcs

    0 pcs

    0 pcs

    Software

    0 pcs

    1 pcs 05:11

    1 pcs 05:11